DCS Commissioning
Goal
The DCS commissiong will verify the integration of DCS framework with detector subsystem software, and prepare the experiment for prompt data taking.
Operations

Jump to DCS software commissioning for system procedures, monitoring, and contacts.
Schedule
This is a summary of the major items from the Daya Bay Project Schedule
DocDB-4035
.
Major Milestones
| Date |
Task |
Elog Link |
Results |
| Jan. 20 - Feb. 1, 2010: |
installation |
Elog Link Here |
(link to result goes here ) |
| Feb. 1 - Feb. 20, 2010: |
debugging |
Elog Link Here |
(link to result goes here ) |
System Involved in Integration
ADs
- AD sensors( Liquid level, Tilt sensors, Overflow temperature sensors) (Wei, UW)
- Internal vistual cameras (Mike, UW)
- Liquid level camera (Zhijian, DGUT)
- Minral oil clarity monitoring (MOMon) (Raymond Kwok, CHUK)
- CAL monitoring (Jianlai&Raymond, CalTech)
- Cover Gas (Wise,UW)
MUONs
- Water pool 8 inch PMT HV (Kam-Biu)
- RPC HV (Jiawen,Jilei, IHEP)
- RPC GAS (Changguo, Princeton)
- Water system (Changgen, IHEP)
- IOW Caliboration (Yue Meng, VirginiaTech)
Environment (Xiaonan?)
- Site ?
- Temperature and Humidity ?
- Pressure ?
- Radon monitor (Yanchang?)
Equipment IPs
How to request a DCS IP
Two ways to request:
- Send email to YeMei and provid information of your equipment.
- Fill the following register items for your equipment:
Current DCS PCs
- DCS PCs: #1(AD HV,VME),#2(muon HV,VME,RPC HV),#3(water pool)
- AD PCs: #1(Sensors), AD CAMERAs: 2 PCs(#2 #3) for each AD. Total:16
- MUON PCs: #1(RPC GAS)
- MO Mon PCs: #1(MO Clarity Monitoring PC)
Tests and Criteria
Onsite Documents
Meetings
References

Copyright © by the contributing authors, 2007-2026.
Ideas, requests, problems regarding Daya Bay?
Send feedback