Civil Construction Updates |
January 2008 |
Portal of the construction tunnel. Slope protection above the portal is done. Constructing the framework against fly rock.
|
Jan. 16, 2008, the framework against fly rock is completed. Waiting for inspection. |
Jan. 9, 2008, the base of the slop protection on side of the road to the access tunnel is completed. The base of the original stockroom is kept. The slope protection above the main portal is being constructed. |
Anchor added to the base of the stockroom. |