Civil Construction Updates |
December 2007 |
Access tunnel portal before excavation. A stockroom (the white building) right in front of the selected portal need be removed.
|
The stockroom is removed. |
Excavation. The road to the portal will be lower than the base of the original stockroom.
|
Excavation is done.
|
Entrance of the construction tunnel. |