Civil Construction Updates

December 2007

 

Access tunnel portal before excavation. A stockroom (the white building) right in front of the selected portal need be removed.

 

The stockroom is removed.

Excavation. The road to the portal will be lower than the base of the original stockroom.

 

Excavation is done.

 

Entrance of the construction tunnel.